STACK EMISSION MONITORING
NOx sampling apparatus is used for monitoring NOx. Follow the steps of monitoring as mentioned in the manual provided with the kit.
Pitot tubes and sampling probes are available (up to 4m size) and can be procured to meet such requirements.
Cellulose thimbles can be used for stack temperature up to 150 degree Celsius and Glass fiber thimbles can be used up to a temperature of 500 degree Celsius.
Appropriate cyclone and dust collectors can be placed ahead of the filter holder to collect the coarse dust particles before they reach the thimble.
Yes, extended hose pipe is available (length up to 10m) to connect the vacuum pump with the instrument panel.
No, one has to use a vacuum pump driven by a flame-proof motor for oil refineries.
Contact EIPL service engineer.
Heated probes are available to be used in high moisture conditions.
Density can find out by using ORSAT Apparatus or the flue gas analyzer
Refer to the operation manual. For further support, please get in touch with EIPL service engineer.
PM 10 Sampler
Check the power cable, socket, fuse and MCB. Also, check the timer is in ‘Manual Mode’.
Ensure that the distilled water is filled in the manometer tube up to the ‘Zero’ level mark. Unscrew the front plate and ensure that the manometer tube assembly is rightly placed with all connections in place.
Follow the steps mentioned in the manual provided by EIPL and set the timer step by step. If the problem persists, please contact EIPL service engineer.
Please contact EIPL service engineer.
This could be because of fault in the flow controller card fitted inside the logger. Please contact EIPL service engineer.
PM 2.5 sampler- APM 550 MFC & APM 550 EL
Please contact EIPL service engineer.
Remove the pendrive and insert it again.
Please contact EIPL service engineer.
Check if the VFD is running and AC filter for voltage output (should be 220 V)
Check Micro- controller card is rightly placed.
Check if the VFD is running and AC filter for voltage output (should be 220 V).
Check the inlet pipe for blockage and clean it. For further support, please contact EIPL service engineer.
APM 550/ APM 550 Mini
Check the power cable, input socket, and fuse.
Check for the leakage with the help of the leak check adapter. Check the “O” ring and gasket and replace if required. Check the blue pipe connected with PU fitting for holes/cuts/ leakages.
Please contact EIPL service engineer.
Personal Dust Sampler
Check the battery, ensure that it is fully charged and the indicator is glowing. Connect the charger, wait for some time and restart the instrument.
Ensure that the battery is not kept unattended for more than 6-7 days. Battery should be charged and discharged frequently by using the equipment.
Adjust the flow with the help of a screwdriver.
Handy Sampler
Check the battery, ensure that it is fully charged and the indicator is glowing. Connect the charger, wait for some time and restart the instrument.
Check the settings of digital timer. if the problem persists, please connect with the EIPL service engineer.
SLM 100 & SLM 109
Fully charge the instrument, it might take around 14 hours and try switching it ON again. If the problem persists, please contact the EIPL service engineer.
Connect with the EIPL service engineer.
Weather Monitoring Station
Check the potentiometer and cable for the direction sensor.
Check the logger display, cable and disc and cards of speed sensor.
Check the logger display, cable and temperature and humidity sensor.
Connect with the EIPL service engineer.
check the logger cable and Read switch voltage with the help of multimeter it should be 5 volts DC.
Adopt the same process for the barometric pressure sensor and the solar radiation sensor.
Install Java In the computer by the CD provided by Envirotech Instruments Private Limited along with the weather monitoring station. In general, Java updates automatically in 15 days. Ensure that whenever you're using a weather monitoring station software the recommended Java version is installed.